Agenda
Traffic Committee


For the 2nd Traffic Committee Meeting
Friday, June 17, 2011
Committee Room C-12, Tom Davies Square
(2nd) , Chair
Joscelyne Landry-Altmann, Vice Chair

(Please ensure that cell phones and pagers are turned off)

DECLARATIONS OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF

MANAGERS' REPORTS

1. Report dated May 27, 2011 from the General Manager of Infrastructure Services regarding Maximum Speed Limit - South Bay Road, Sudbury.

(RECOMMENDATION PREPARED)
(City staff received a request from Ward 10 Councillor, Frances Caldarelli, Jo-Anne Palkovits, President and CEO of the St. Joseph's Health Centre and Leo Therrien, Executive Director of the Maison Vale Inco Hospice, to reduce the speed limit from 50 km/h to 40km/h on South Bay Road from Ramsey Lake Road to the east end. This report outlines the criteria used by staff to evaluate the maximum posted speed limit based on the physical characteristics of the road and recommend that the maximum posted speed limit remain 50km/h.)

1.1 Full Report (pdf)
1.2 Exhibit A - Maximum Speed Limit_ South Bay Road (pdf)
1.3 Exhibit B - Maximum Speed Limit_ South Bay Road (pdf)
1.4 Exhibit C - Maximum Speed Limit_ South Bay Road (pdf)
1.5 Exhibit D - Maximum Speed Limit_ South Bay Road (pdf)
1.6 Exhibit E - Maximum Speed Limit_ South Bay Road (pdf)

2. Report dated May 27, 2011 from the General Manager of Infrastructure Services regarding Maximum Posted Speed Limit - Municipal Road 80, Hanmer.

(RECOMMENDATION PREPARED)
(City staff received a request from Ward 5 Councillor, Ron Dupuis, to review the maximum posted speed limit on Municipal Road 80 from Yorkshire Drive to Dominion Drive. This report outlines the criteria used by staff to evaluate that the maximum posted speed limit based on the physical characteristics of the road and recommends the maximum posted speed limit be changed from 80 km/h to 70km/h from Yorkshire Drive to Dominion Drive.)

2.1 Full Report (pdf)
2.2 Exhibit A - Maximum Speed Limit M (pdf)
2.3 Exhibit B - Maximum Speed Limit M (pdf)
2.4 Exhibit C - Maximum Speed Limit M (pdf)
2.5 Exhibit D - Maximum Speed Limit M (pdf)

3. Report dated June 1, 2011 from the General Manager of Infrastructure Services regarding Elm Street - Lorne Street to Paris Street, Sudbury, On-Street Parking.

(RECOMMENDATION PREPARED)
(This report was requested at the Traffic Committee meeting held on March 21, 2011, wherein the Committee directed staff “to prepare a report regarding the proposal to allow on-street parking on Elm Street including bicycle lanes as proposed by the Downtown Village Development Corporation and Downtown Sudbury BIA".)

3.1 Full Report (pdf)
3.2 Exhibit A - Elm Street-Lorne Street to Paris Street (pdf)
3.3 Exhibit B - Elm Street-Change in 2009 PM Peak Volumes with Parking on Both Sides (pdf)
3.4 Exhibit C - Elm Street-Change in 2009 PM Peak Volumes with Parking on Both Sides and Ste (pdf)

4. Report dated May 27, 2011 from the General Manager of Infrastructure Services regarding Traffic Control - 1) Redwood Subdivision, Sudbury, Phase 1 and 2) Sunrise Ridge Estates Subdivision, Phase 2, Sudbury.

(RECOMMENDATION PREPARED)
(Two (2) new subdivisions are currently being developed in the City of Greater Sudbury. As part of these developments, the City of Greater Sudbury will assume new public roadways. To provide for a safe and orderly flow of traffic, traffic control signs will be required at newly created intersections. This report recommends that a by-law be passed to amend Traffic and Parking By-Law 2010-1 in the City of Greater Sudbury.)

4.1 Full Report (pdf)
4.2 Exhibit A - Traffic Control_Redwood Subdivision Phase 1 (pdf)
4.3 Exhibit B - Traffic Control_Sunrise Ridge Estates Subdivision Phase 2 (pdf)

5. Report dated May 27, 2011 from the General Manager of Infrastructure Services regarding New Traffic Signal Installations - Main Street (M.R. 24) at Sixth Avenue, Lively.

(RECOMMENDATION PREPARED)
(As part of the City's Capital Construction Program, new traffic signals are being constructed at the intersection of Main Street (M.R. 24) and Sixth Avenue, Lively. The contract for this project will be tendered this summer by the City and it is expected that the new signals will be operational later this summer. An amendment to the City's Traffic and Parking By-Law 2010-1 is required to implement the new traffic signals.)

5.1 Full Report (pdf)
5.2 Exhibit A - New Traffic Signal Installations (pdf)

Adjournment (Resolution Prepared)

FRANCA BORTOLUSSI, DEPUTY CITY CLERK

LIZ COLLIN, COUNCIL SECRETARY

No Item Selected